Shedding Light on Train Delays

Train Delays amongst Britain’s trains cost the rail industry over £100 million a year. However, the additional cost to the economy in lost time is over £1 billion [1]. On-time performance is directly impacted by a multitude of events including train reliability, poor track quality, and operation under degraded conditions. To better understand what constitutes the major contributions to delays, the rail industry has embarked on a comprehensive data collection and analysis program [2].  Although it is recognized that there are many potential causes for train delays and data need to be acquired from a wide range of sources, the current approach to analysis is to simply use each individual data source essentially in isolation. This has arisen from primarily a desire to solve a single targeted problem. However, if all the data sources were to be examined in unison, using the power of modern big data analytics, it is highly probable that the industry would not only identify the major contributions to delays more effectively and efficiently, but would also likely make important discoveries of problem areas that would otherwise remain hidden. Through “knowledge discovery from data (KDD)”, potentially saving the rail industry £millions.

Shedding Light on Train Delays

Over the last few years there has been significant anticipation associated with the use of big data techniques for the analysis of rail-related data. However, the major expectations for the approach have yet to be fully realized.

We are currently looking to apply the techniques that have been used in the prediction of solar flares to ‘multi-variable’ analysis of rail problems. We are working closely with a team from Georgia State University (GSU), one of the leaders in the emerging field of data science, who have recently made significant advances in big data analytics related to prediction of solar flares that we believe can be directly applied to complex rail problems. The GSU techniques are based on the combination of decision trees and deep neural networks feeding off multiple data streams.

 

Shedding Light on Train Delays

This multi-data stream approach to prediction fits well with our ELBowTie risk analysis methodology. Over the coming months we will be setting up analysis of real time train data to prove the technique and demonstrate ELBowTie live working.

References

[1] “Reducing passenger rail delays by better management of incidents”, National Audit Office, 2008,

https://www.nao.org.uk/report/reducingpassenger-rail-delays-by-better- management-of-incidents/

[2] “A Digital Railway for a Modern Britain”, Network Rail, 2017, http://digitalrailway.co.uk

 

Institution websites:

https://www.digitaltransit.co.uk/

http://www.gsu.edu/

Hornby BIG DATA Project

Overall Purpose of the Role:

There is a big push to make railways more effective and increase capacity. The main opportunity is to run trains closer together and autonomously. We are building a model railway that can be used to explore possibilities for this. The main theme will be to use an existing model railway set-up that already has digital control. See the set up on https://www.youtube.com/watch?v=AjSHDU2B474

Hornby BIG DATA Project Layout Under DCC Control

Hornby BIG DATA Project Layout Under DCC Control

The idea will be to fit proximity sensors to the track and model trains and tachometer on the trains so that the system knows exactly the whereabouts on the train-set of the trains. The movement of points will be automated based upon the routes chosen for the trains. The trains will be kept apart by knowing their own speeds, lengths and braking distances and those of the other trains on the train-set. There should be some facility to establish that a train formation is complete (i.e. it has not left a coach behind due to an inadvertent decoupling.)

It may be necessary to fit a vision system of the office ceiling to ascertain where the trains are on the network and also potentially on the front of the train to detect objects fouling the line or other trains. We are using Arduino technologies and commercially available sensors, cameras and radio, see the attached appendix.. The finished system will be used as a training tool and a means to experiment with different traffic management strategies and autonomous technologies. We will also look to experiment with detecting the health and resilience of the various components such as the electric train drives using available data such as current usage, noise etc.

Before the project starts we will have preliminary system design worked out however this will need to be detailed, adapted and implemented.

The system is currently controlled by Hornby OO train set and E-Link/Train master Digital Control system. See pictures below.

Main Task to do:

  • To develop technology demonstrator of a moving block automated signalling system based upon a Hornby OO train set and E-Link/Train master Digital Control system.
  • To write any code necessary.
  • To configure electronic and sensors and implement them with the software.
  • The job will involve certain practical tasks such as soldering, electrical testing, using basic modelling hand tools etc.

Bill of Material So Far:

Bill of Material so far